August 4, 2018

2 solar companies eye dedicated power lines

By Alena Mae S. Flores – August 03, 2018 at 07:50 pm from manilastandard.net Two power companies asked the Energy Regulatory Commission to approve point-to-point infrastructure to connect their wind farms with a combined capacity of nearly 100 megawatts to […]
August 4, 2018

DoE drafts circular on energy storage

By Alena Mae S. Flores – August 03, 2018 at 07:40 pm from manilastandard.net The Department of Energy issued a draft circular on the adoption of energy storage system in the electric power industry.The department in the circular cited different […]
August 3, 2018

Palace expected to release ERC appointments soon

By Myrna M. Velasco – August 2, 2018, 10:00 PM from Manila Bulletin The entire electric power industry is on high anticipation of the release of appointments by Malacanang for those taking the posts vacated by two retired officials of […]
August 3, 2018

Meralco accepts lower offer from Solar Power

By Alena Mae S. Flores – August 01, 2018 at 06:10 pm from manilastandard.net Manila Electric Co. accepted the P2.34 per kilowatt-hour counter offer of Solar Philippines to supply 50 megawatts of power, lower than the P2.98 per kWh proposal […]