July 30, 2021

Spectrum energizes solar farm

BY LENIE LECTURA – JULY 29, 2021 from Business Mirror The Manila Electric Co.’s renewable energy subsidiary, Spectrum, has energized a one-megawatt (MW) solar farm within Maynilad’s La Mesa Pumping station. The solar farm is composed of 2,592 pieces of […]
July 29, 2021

Meralco logs 3% downtrend in tariff due to lower generation charges

By Myrna M. Velasco – July 28, 2021, 5:55 PM from Manila Bulletin The average tariff billed to customers by power utility giant Manila Electric Company (Meralco) had been down by 3.0-percent in the first half of the year, and […]
July 29, 2021

Malampaya shutdown to hike generation charge–Meralco

BY LENIE LECTURA – JULY 28, 2021 from Business Mirror The Manila Electric Co. (Meralco), the country’s largest electricity distribution utility, is anticipating an increase in power generation charge after the Malampaya gas facility shuts down in October. The company, […]
July 27, 2021

536 sites energized in Meralco franchise area

By Jordeene B. Lagare – July 26, 2021 from The Manila Times The Manila Electric Co. (Meralco) made another major stride in its P1.1-billion electrification program. The power distributor reported it was able to energize 536 priority sites in June from only […]