March 30, 2023

NGCP to DOE: Transmission projects devt to be fast-tracked

BY LENIE LECTURA – MARCH 27, 2023 from Business Mirror THE National Grid Corporation of the Philippines (NGCP) has accepted the challenge of the Department of Energy (DOE) to fast-track the development of transmission projects in the country. In a […]
March 27, 2023

NGCP to DOE: Transmission projects devt to be fast-tracked

BY LENIE LECTURA – MARCH 27, 2023 from Business Mirror THE National Grid Corporation of the Philippines (NGCP) has accepted the challenge of the Department of Energy (DOE) to fast-track the development of transmission projects in the country. In a […]
March 23, 2023

DOE assures grid integration of RE capacities

BY MYRNA M. VELASCO – Mar 22, 2023 11:37 AM from Manila Bulletin AT A GLANCE The DOE targets 11,610MW RE installations from 2024-2026 2,000MW of RE capacities under GEAP-1 will be on-line by 2024-2025 Grid integration is major concern […]
March 21, 2023

Second phase of Green Energy Auction to offer 11,610 MW

By Alena Mae S. Flores – March 20, 2023, 7:05 pm from manilastandard.net The Department of Energy plans to offer 11,610 megawatts under the Green Energy Auction Program 2 covering the period 2024 to 2026. DOE Undersecretary Rowena Cristina Guevara […]