March 9, 2017

Industry source: Meralco generation charge for March may amount to P4.90 per kWh

By Lenie Lectura – March 8, 2017 from Business Mirror Generation charge of the Manila Electric Co. (Meralco) for this month could amount to P4.90 per kilowatt-hour (kWh), higher than the previous month’s P4.32-per-kWh generation charge. The amount already includes the P0.22-per-kWh adjustment in […]
March 8, 2017

ERC cuts FiT rates for hydro and biomass projects

By Lenie Lectura – March 7, 2017 from Business Mirror The Energy Regulatory Commission (ERC) has lowered the Feed-in-Tariff (FiT) rates for hydro and biomass power projects that are scheduled for commercial operations this year. In a two-page resolution signed by the ERC […]
March 7, 2017

Energy mix stays despite Paris pact

by Alena Mae S. Flores –  March 05, 2017 at 08:35 pm from Manila Standard Today The Energy Department said the proposed energy mix until 2030 will remain the same even after the Philippines signed the Paris Agreement on climate change last week. […]
March 7, 2017

ERC trims Meralco’s recovery

by Alena Mae S. Flores – March 06, 2017 at 08:20 pm from Manila Standard Today The Energy Regulatory Commission reduced Manila Electric Co.’s planned power rate adjustment as a result of the 20-day Malampaya maintenance shutdown. ERC approved a fuel cost recovery […]