November 22, 2024

APRI, SDEPCI ink deal for BESS project

By Lenie Lectura – November 22, 2024 from Business Mirror AP Renewables Inc. (APRI), the geothermal arm of Aboitiz Power Corp., together with Aboitiz Renewables Inc. (ARI) signed an engineering, procurement, and construction contract (EPC) with Shandong Electric Power Engineering […]
January 12, 2022

8 power firms get nod to conduct SIS—DOE

BY LENIE LECTURA – JANUARY 11, 2022 from Business Mirror Eight power firms were allowed to conduct a system impact study (SIS) on their proposed power projects with a combined capacity of over 5,000 megawatts (MW). Data from the Department […]
December 3, 2020

Mitsubishi Power to upgrade Makban geothermal facility

By Lenie Lectura – December 2, 2020 from Business Mirror Mitsubishi Power, a subsidiary of Mitsubishi Heavy Industries (MHI) Group, was selected to upgrade a geothermal power unit of the Makban geothermal power facility owned by AP Renewables Inc. (APRI). […]