October 2, 2020

Top power firms keen on Meralco CSP

By Lenie Lectura – October 1, 2020 from Business Mirror   The biggest power producers in the industry, including San Miguel Corp. (SMC), are now evaluating the bid terms released Thursday by the Manila Electric Co. (Meralco) for the 1,800megawatts […]
October 2, 2020

NGCP’s Attempts to Connect Mindoro and Palawan to Its Franchise Area of Luzon Not Totally Objectionable but must be Done Right, and over a Right Transition Period (Part 2)

David Celestra Tan, MSK 27 September 2020   Continuation CONCERNS OF CONSUMERS 1. MSK as a consumer advocacy group is notper se againstthe idea of inter-connecting these two large off-grid islands to the main grid and Luzon. It just needs […]
October 2, 2020

AC Energy names contractor for Australia project

By Lenie Lectura – October 1, 2020 from Business Mirror UPC\AC Australia, a joint venture between UPC Renewables and AC Energy, has tapped Elecnor Australia as the engineering, procurement and construction (EPC) contractor for the first stage of the 720megawatt […]
October 2, 2020

ERC to direct Meralco, power firms to extend bill payments

By Myrna M. Velasco – October 1, 2020, 1:08 PM from Manila Bulletin The Energy Regulatory Commission (ERC) is scheduled to issue an advisory or order that will direct power utilities, like the Manila Electric Company (Meralco), to extend for […]