By Alena Mae S. Flores – March 29, 2019 at 08:00 pm
from manilastandard.net
State-run Power Sector Assets and Liabilities Management Corp. has moved the new deadline for the submission of expressions of interest and first stage requirements of the Architectural Conceptual Design Contest for the National Power Corp. complex in Quezon City to April 5.
PSALM said the postponement of the original schedule of March 22 would give it more time to update the contest’s mechanics and consider the preparation of the eligibility requirements from interested participants.
“The design contest shall select the most energy-efficient conceptual design that could be used as basis for the master planning and redevelopment of the 5.1-hectare Diliman property which includes the current locations of Napocor, National Transmission Corporation and National Grid Corporation of the Philippines,” PSALM said.
The entire property, covering 5.1 hectares, is centrally located in a long stretch of commercial establishments adjacent to Centris Walk and Vertis North in Quezon City.